MLC 104 IP Plus • Software Setup

Software Setup, cont’d

3-22

MLC 104 IP Plus • Software Setup

3-23

Step 10: Create a Dsplay Dsconnecton

E-mal

To set a display disconnected e-mail alert, do the following:
1

.

Click the Monitor tab in the Global Configurator window.

2

.

Click the Add Monitor button below the Monitored

Conditions

window. The Monitored Conditions Wizard

window appears.

3

.

Enter a name (Disconnected) in the Enter Monitored

Condition Name

field area. The label now appears in the

left pane.

4

.

Click Next to specify a condition.

5

.

Select the desired equipment (for our purposes, choose the

Epson PowerLite 7700p

) from the Subject Port window

and Connection Status: Disconnected from Available

Options

.

6

.

Click Apply Condition, then click Next.

7

.

Click Next again to add an e-mail notification.

8

.

Highlight the appropriate e-mail message (Disconnect

Notification

) and contacts (e-mail recipient(s)), and click

Apply Email/Contacts

.

9

.

Click Done. The dialog box closes.

Step 11: Buld and Upload a Configuraton

The Global Configurator project file contains all the

configuration data (port assignments, product/device locations,

scheduling data, etc.) you have created in Global Configurator.

This is the data used to build the project's GlobalViewer Web

pages for the MLC 104 IP Plus.

Buldng a configuraton

To build a configuration, do the following:
1

.

Click the GlobalViewer tab at the left window to open

GlobalViewer Designer.

2

.

Confirm that all configured products have been given a

location. If not, drag each product to the desired location

or create new ones.

3.

Save your project file. If a project file has not been

saved, GC prompts you to do so before building the

configuration.

4

.

From the Build menu, choose Build All Configurations or
Build Changed Configurations

.

The Build menu

An activity bar appears, indicating that the build is

progressing. The Upload Manager dialog appears when

the build is complete.

Uploadng a configuraton

The process of uploading your project is essential to successfully

configuring the MLC 104 IP Plus and creating a GlobalViewer

Web page. You can upload the project to one MLC at a time or

several at once.

N

You can configure devices offline, but the device must be

connected to the network for a successful upload.

The Upload Manager appears only after a build has been

successfully performed on at least one device. If errors occur

during the build of any devices, a dialog box appears listing the

errors.

The Upload Manager window before file upload