Throttle linkage and ignition leads – Echo PE-280 User Manual

Page 10

Advertising
background image

10

5. Tighten two (2) drive shaft clamp bolts (B) securely.

a

B

B

a

B

C

D

C

D

throttle

lInkage

and

IgnItIon

leads

1. Close choke and remove air filter cover.

2. Place inner throttle cable in large hole of carburetor swivel (A).
3. Loosen nuts (B) and place threaded end of throttle linkage in

bracket slot. Finger tighten nuts (B).

4. Check throttle for freedom of movement and that wide open

throttle / low idle extremes are adjusted properly. If adjustment

cannot be achieved with adjusting nuts (B), consult with your Echo

Dealer for correct adjustment procedure. Tighten nuts (B).

5. Connect 2 ignition stop leads (C,D) from throttle cable tubing to 2

ignition leads (C,D) on engine.

6. Gather ignition wires and position behind air filter case.

7. Install air filter and cover.

Advertising