Assembly – HONDA HARMONY FG100 User Manual

Page 33

Advertising
background image

6. Install the grip on the right lower handle. Apply

a small mount of dish soap to the right handle
pipe to ease the installation of the grip.

7. Install the pipe plug into the left lower handle.

8. Secure the left and right lower handles using

the 1/4-20 x 2 inch flange bolt, two curved
washers and a 1/4 inch locking nut.

9. Securely tighten the hardware to complete the

installation of the left and right handles to the
tiller.

Use a torque wrench and finish tightening the
hardware to: 8 ft-lb (10.8 N•m)

10. Install the upper handle to the lower handles

using the two 5/16-18 x 1 1/2 inch curved-head
bolts, two curved washers and the two
handlebar knobs.

Make sure the throttle cable and engine switch
harness are on the outside of the upper and
lower handlebars.

11. Install the grips on the upper handle. Use a

small amount of liquid dish soap on the upper
handle pipe to ease grip installation.

12. Lift the throttle lever towards the handlebar to

expose the slotted hole.

13. Take the cylinder end of the throttle cable and

insert it in the throttle lever slotted hole.

CURVED WASHER
(2)

1/4-20 x 2 inch FLANGE BOLT

1/4 inch LOCKING
NUT

PIPE PLUG

GRIP

RIGHT
LOWER
HANDLE

LEFT LOWER HANDLE

5/16-18 x 1 1/2 in
HANDLEBAR
BOLT (2)

CURVED
WASHER
(2)

HANDLEBAR
KNOB (2)

UPPER HANDLE

GRIP

THROTTLE
CABLE

ENGINE
SWITCH
HARNESS

THROTTLE
CABLE

THROTTLE LEVER

THROTTLE CABLE
CYLINDER

THROTTLE LEVER
SLOTTED HOLE

ASSEMBLY

FG100 TILLER

31

Advertising