Prepare - 29

Prepare Jobsite

CMW

Prepare Jobsite

Install Fluid Unit

Consider Load Requirements

Installation Tips

•

Drill holes through trailer cross members to provide adequate connection to trailer structure, not just
deck boards.

•

Use high-quality, properly-sized mounting hardware.

Jobsite hazards could cause death or serious injury. Use

correct equipment and work methods. Use and maintain proper safety
equipment.

NOTICE:

•

If jobsite classification is in question or if the possibility of unmarked electric utilities exists, classify
jobsite as electric.

•

Cutting high voltage cable can cause electrocution. Expose lines by hand before digging.

•

All vegetation near operator’s station must be removed. Contact with trees, shrubs, or weeds during
electrical strike could result in electrocution.

IMPORTANT: The FM5 unit must be installed on a trailer or truck that meets the following requirements.

•

All trailer or truck components including axles and tires are in good condition.

•

Axle loads meet US requirements. In countries other than the US, check local regulations.