Assembly / pre-operation – Husqvarna 5524STE User Manual

Page 6

Advertising
background image

6

ASSEMBLY / PRE-OPERATION

INSTALL DISCHARGE CHUTE / CHUTE ROTATER
HEAD (See Fig. 7)

NOTE: The multi-wrench provided in your parts bag may
be used to install the chute rotater head.

1. Place discharge chute assembly on top of chute base

with discharge opening toward front of snow thrower.

2. Position chute rotater head over chute bracket. If nec es -

sary, rotate chute assembly to align square and pin on un-
der side of chute rotater head with holes in chute brack et.

3. With chute rotater head and chute bracket aligned,

po si tion chute rotater head on pin and threaded stud
of mounting bracket.

4. Install 3/8 washer and locknut on threaded stud and

tighten securely.

CHECK TIRE PRESSURE

The tires on your snow thrower were overinflated at the fac-
tory for shipping purposes. Correct and equal tire pres sure
is important for best snow throwing performance.

Reduce tire pressure to 14-17 PSI (19-24.5 N-m).

AUGER
CONTROL
ROD

CONTROL
ARM

RUBBER
SLEEVE

LOOP

OPENING

UP

FIG. 5

INSTALL AUGER CONTROL ROD (See Figs. 5 and 6)

The auger control rod has the short loop on the end of the
spring as shown.

1. Slide rubber sleeve up rod and hook end of spring into

control arm with loop opening up as shown.

2. With top end of rod positioned under right side of

control panel, push down on rod and insert end of rod
into hole in auger control bracket. Secure with retainer
spring.

AUGER

CONTROL

LEVER

AUGER CONTROL ROD

AUGER

CONTROL
BRACKET

RETAINER
SPRING

FIG. 6

CHUTE
ROTATER
HEAD

3/8 WASHER

3/8 LOCKNUT

THREADED

STUD

PIN

ROTATER HEAD

MOUNT ING

BRACKET

CHUTE
BRACKET

FIG. 7

ALIGN BEFORE

TIGHTENING LOCKNUT

Advertising