haier 1590 SB User Manual

Page 12

Advertising
background image

Maintenance

12

310622L

Preventive Maintenance Schedule

Establish a preventive maintenance schedule based on
the pump’s service history. This is especially important
for prevention of spills or leakage due to diaphragm
failure.

The following is a list of recommended maintenance
procedures and frequencies to operate your equipment
safely. Maintenance must be performed by trained per-
sonnel per this schedule to assure safety and reliability
of the equipment.

Operator

Maintenance Person

Task

Daily

Weekly

Monthly

Inspect system for leaks

Depressurize fluid, after
operation

Remove heat from system,
after operation

Inspect diaphragm for wear

Inspect check valve compo-

nents for wear

Check hoses for wear

Check/tighten fluid connec-
tions

Check/tighten air connec-
tions

Lubricate air valves

Advertising
This manual is related to the following products: