Hunter Fan Saturn 90058 User Manual

Page 5

Advertising
background image

41718-01 01/28/2008

5

9

E

pop out the first wiring access slug. Use second if needed.

Insert the strain relief into the housing and

secure with the washer.

position the correct depth mark at the bottom edge of the

joist based on the thickness of your sheetrock.

New Construction - attaching to joist

10

B

C

Choose Installation Option

For New Construction - attaching to joist go to step A11, page 5

For New Construction - suspended between joists go to step B11, page 8

For Existing Construction - accessible from above go to step C11, page 11

For Existing Construction - accessible only from below go to step D11, page15

A11

E

5/8

1/2

5/8

1/2

A12

Screw pre-loaded screws into joist or framing.

028_41718_EngS_1.28.08_Arial.indd 5

1/28/08 10:47:13 AM

Advertising
This manual is related to the following products: