Warning / caution – Hubbell Electric Heater Company SLN User Manual

Page 8

Advertising
background image

8

SECTION II –

INSTALLATION

WARNING / CAUTION


DO NOT TURN ON THE SOLAR WATER SUPPLY to this equipment until heater is completely
filled with water and all air has been released. If the heater is NOT filled with water when the power
is turned on, damage to the heating coil may result.


For protection against excessive pressures and temperatures, local codes require the installation of a
temperature-and-pressure (T&P) relief valve certified by a nationally recognized laboratory that
maintains periodic inspection of production of listed equipment of materials, as meeting the
requirements for Relief Valves and Automatic Gas Shutoff for Hot Water Supply Systems. ANSI
Z21.22-1971. THE CUSTOMER IS RESPONSIBLE TO PROTECT PROPERTY AND
PERSONNEL FROM HARM WHEN THE VALVE FUNCTIONS.

All water heaters have a risk of leakage at some unpredictable time. IT IS THE CUSTOMER'S
RESPONSIBILITY TO PROVIDE A CATCH PAN OR OTHER ADEQUATE MEANS, SO THAT
THE RESULTANT FLOW OF WATER WILL NOT DAMAGE FURNISHINGS OR PROPERTY.

WATER HEATER PLACEMENT

1. Place the heater on a solid foundation in a clean, dry location nearest to the point of most

frequent hot water use.

2. The water heater should be protected from freezing and waterlines insulated to reduce energy

and water waste.

3. Leave a minimum of 18” clearance for heating coil withdrawal, if necessary.

INSTALL THE HEAT EXCHANGER COIL

1. Remove the access panel. (See diagram below).

2. Insert the heat exchanger and align the holes in the cover plate with the slotted holes in the

flange. (Note: align heat exchanger pipe connections with the opening in the access panel.)

3. WARNING: THE NYLON BUSHINGS MUST BE IN THE OPENINGS BEFORE THE

BOLTS ARE INSERTED. FAILURE TO DO THIS WILL VOID THE WARRANTY.

4. Insert and secure the bolts to the nuts one at a time in the following manner.

a. Place the nut behind the slotted flange opening.
b. Hold the nut in place with one hand – insert the bolt with the other.
c. Thread the bolt into the nut and tighten.
d. Proceed to the next opening.
e. NOTE: BE SURE TO PLACE BOLTS IN ALL OF THE OPENINGS.

Advertising