Parts list – HP CH 220 User Manual

Page 4

Advertising
background image

PO Box 577 • West Hwy 4
LaCrosse, KS 67548-0577
1-800-255-2469 • 785-222-2873 • Fax 785-222-3619
www.FlameEngineering.com

OPERATING INSTRUCTIONS FOR THE “Hot Box”
RED DRAGON CH 220, CH 225 AND CH 250 CONSTRUCTION HEATERS

Questions?

If you have any questions about the operations of the CH 220, CH 225 or CH 250 call your local

distributor or Flame Engineering, Inc. at 1-800-255-2469 or fax 785-222-3619.

Parts List

1.

P-3200 W (CH 220)

Excess Flow P.O.L.

P-W 795 (CH 225 & CH 250) Hand Tighten Excess Flow P.O.L.

2.

R-700 C

18 P.S.I. Preset Regulator

3.

HP 10 TS (CH 220)

U.L. Listed 10’ LP Gas Hose

HP 25 TS (CH 225)

U.L. Listed 25’ LP Gas Hose

HP 50 TS (CH 250)

U.L. Listed 50’ LP Gas Hose

4.

1/4” Female x 3/8” Male Flare Elbow

5.

H-19 H

Safety Valve

6.

M-3012

12” Thermocouple

7.

Model 21

Ignitor with Lead Wire (3309)

8.

332

Spark Plug

9.

100-CH 221

Heater Burner

10.

V-326

Flame Control Valve

11.

1/4” Elbow

12.

CH 221

Complete Burner/Control Assembly

(Includes everything except hose, regulator & P.O.L.)

1

2

3

4

5

6

7

8

9

10

11

Safety & Operating Information

Burner Securing Bolt

Heat Shield

Heater Cabinet

CH220INST12/10/03

12

Advertising
This manual is related to the following products: