Hoshizaki KM-61BAH User Manual
Page 52
Advertising

47
WARNING
Always protect the valve body by using a damp cloth to prevent the valve
from overheating. Do not braze with the valve body exceeding 274°F.
8) Install the new Drier (see “4. DRIER”).
9) Check for leaks using nitrogen gas (140 PSIG) and soap bubbles.
10) Evacuate the system and charge it with refrigerant (see “1. [c] EVACUATION AND
RECHARGE”).
11) Attach the Solenoid Coil to the valve body, and secure it with the screw.
12) Connect the lead wires.
13) Refi t the panels in their correct positions.
14) Plug in the icemaker or connect the power source.
Advertising
This manual is related to the following products: