Installation preparation, Preparing hood location – haier 3000 User Manual

Page 5

Advertising
background image

English

4

installation Preparation

To install this range hood, you will need the following tools and materials:

note: this procedure will require 2 people for easier installation.

tools needed for installation

• Drill

• 1/8” Drill bit for drilling pilot holes

• 1-1/4” Wood bit for drilling electrical wiring access hole

• Phillips head screwdriver

• Flat-head screwdriver

• Pliers

• Pencil, ruler and level for marking range hood location

• Hand saw or jig saw for cutting the wall or cabinet openings

• Hi-Temp duct tape

• Electrical tape

• Connector Clamp

Preparing Hood Location

1. Determine whether hood will discharge vertically (3¼” x 10” or 7” Round),

horizontally (3¼” x 10” only) or non-ducted. For vertical or horizontal discharge,

run ductwork between the hood location and a roof cap or wall cap. For best

results, use a minimum number of transitions and elbows.

2. Use diagram, below, for proper placement of ductwork and electrical cutout in

cabinet or wall. For a non-ducted installation, DO NOT cut a duct access hole.

3. Run house wiring between service panel and hood location.

Advertising
This manual is related to the following products: