Important, Yx x – Husky 16628 User Manual

Page 5

Advertising
background image

5

B

A

Y

Y

X

X

(2) 3" Nails

24"

(61 cm)

24"

(61 cm)

24"

(61 cm)

24"

(61 cm)

24"

(61 cm)

92-5/8"

(4) 3" Nails

at Joint

120"

(305 cm)

Center of

Stud

Center of

Stud

Center of

Stud

Center of

Stud

C

C

C

C

C

D

D

D

D

E

E

E

NOTE: Part letters are not stamped on floor
kits.

ASSEMBLY OF 10’ x 92-5/8” FLOOR FRAME

A:

Position Floor Joists 89-1/2”, Floor

Bond Boards 72”, and Floor Bond

Boards 48” as shown.

Using 3” nails, nail twice through
each Bond Board & into each
end of each Joist , keeping pieces
flush at top and ends, and maintain 24”
spacing. Where & join together
use 4-3” nails.

B:

Completed Floor Frame should be

positioned at building site, leveled,

using shims between floor frame and

ground before proceeding to Floor
Panel Attachment.

Square frame by making corner-to-
corner measurements (X to X and
Y to Y) the same.

2 - 48x92-5/8x5/8" Floor Panels
1 - 23-7/8x92-5/8x5/8" Floor Panel
6 - 2x4x89-1/2" Floor Joist
2 - 2x4x72" Bond Boards
2 - 2x4x48" Bond Boards
- 2" and 3" Nails

A

B

C

D

E

Parts Needed:

C

D

E

D

E

C

D

E

F L O O R K I T I N S T R U C T I O N S
FOR 10X8 BUILDINGS

ACTUAL SIZE 120” WIDE x 92-5/8” DEEP

NOTE: Part letters are Not stamped on floor kits. ASSEMBLY OF 10’ x 92-5/8” FLOOR FRAME

IMPORTANT!

If you will be storing heavy items (such as lawn tractor, motorcycle, snowmobile etc.)

we recommend you upgrade from 24” on center (61 cm) to 12” on center (30.5cm) floor

framing. This requires you to add the following material:

• Qty. (5) of 2”x 4”x 89-1/2” (5 x 10 x 227 cm) Treated • 20 ea. 3” (7.6cm) galvanized nails

Advertising