Assembly / pre-operation – Husqvarna 8527 STE User Manual

Page 7

Advertising
background image

7

ASSEMBLY / PRE-OPERATION

CHECK TIRE PRESSURE

The tires on your snow thrower were overinfl ated at the fac-
tory for shipping purposes. Correct and equal tire pres sure
is important for best snow throwing performance.

• Reduce tire pressure to 14-17 PSI.

INSTALL DISCHARGE CHUTE / CHUTE ROTATER HEAD
(See Fig. 7)

NOTE: The multi-wrench provided in your parts bag may
be used to install the chute rotater head.

1. Place discharge chute assembly on top of chute base

with discharge opening toward front of snow thrower.

2. Position chute rotater head over chute bracket. If nec-

es sary, rotate chute assembly to align square and pin
on un der side of chute rotater head with holes in chute
brack et.

3. With chute rotater head and chute bracket aligned,

po si tion chute rotater head on pin and threaded stud
of mounting bracket.

4. Install 3/8 washer and locknut on threaded stud and

tighten securely.

CHUTE
ROTATER
HEAD

3/8 WASHER

3/8 LOCKNUT

THREADED

STUD

PIN

ROTATER HEAD

MOUNT ING

BRACKET

CHUTE
BRACKET

FIG. 7

Advertising