ST9141A1002 Operating Sequence

Action

System Response

Thermostat calls for heat.

• Pressure switch confirmed in no airflow position. (If pressure switch shows

(W terminal is energized.)

airflow, LED flashes three times.)

• Combustion air blower is energized.
• Air proving switch makes (air flow is established).
• Ignition system is energized.
• Gas valve opens and main burner lights.
• Heat fan on delay timing begins. When timing is complete, circulating blower

is energized at heat speed.

Thermostat ends call for heat.

• Ignition system is de-energized and gas valve closes.

(W terminal is de-energized.)

• Combustion air blower is de-energized after postpurge timing.
• Heat fan off delay timing begins. When timing is complete, the circulating fan

is de-energized.

Thermostat begins call for cool.

• Cooling contactor is energized.

(G and Y terminals are energized.)

• Circulating fan is energized at cool speed after cool fan on delay timing.

Thermostat ends call for cool.

• Cooling contactor is de-energized.

(G and Y terminals are de-energized.) • Circulating fan turns off after cool fan off delay timing.

Thermostat begins call for fan.

• Circulating fan is energized at heat speed two seconds after G terminal is

(G terminal is energized.)

energized.

• If a call for heat occurs, circulating fan continues to run at heat speed.
• If a call for cool occurs, circulating fan switches to cool speed after four-

second delay.

Thermostat ends call for fan.

• Circulating fan is de-energized.

(G terminal is de-energized.)

Primary limit switch string opens.

• Thermostat and ignition system are de-energized and gas valve closes.
• Combustion air blower is de-energized.
• Circulating fan is energized at heat speed.
• LED flashes twice.
• If there is a call for cooling or fan, the circulating fan switches from heat speed

to cool speed.

Setting the Heat Fan Off Delay DIP Switches

Set the heat fan off delay DIP switches to 60, 100, 140 or

180 seconds as shown in Fig. 3. The off delay is factory-set
at 140 seconds. This delay time starts when the main gas
valve is de-energized at the end of a thermostat call for heat.

Checkout

Assure the system operates properly by operating the

system through at least one complete heating cycle and
cooling cycle. Troubleshoot by checking for appropriate
voltages at the ST9141A1002 terminals controlling the
combustion air blower and heat and cool speed circulating
fan. The ST9141A1002 schematic shows internal switch-
ing to clarify operation and assist in troubleshooting. See
Fig. 2.

Fig. 3—Setting delay off DIP switches.

60 SECONDS 100 SECONDS 140 SECONDS

180 SECONDS

M5658

DELAY OFF DIP SWITCH SETTINGS

1

2

1

2

1

2

1

2

ON

OFF

UNUSED

G

W

C

Y

R

C

Y

1

2

UP

SPEED

DELAY

OFF

Z1

Z2

1

2

3

DI

1

2

3

4

N

MOTOR

LEADS

C

X

XFMR

SEC

X

EAC

N

HUM

N

CIR

BLWR

CONT

COOL

HEAT

ST9141

NEUTRAL

(continued)

Advertising