Follett HCC1000A User Manual

Page 21

Advertising
background image

21

Fig. 22

11. Reconnect transport tube to louvered

docking assembly.

12. Plug sensor in at the electrical box.
13. Reconnect vent tube to the shuttle housing

as shown.

Apply

petrol-gel

Fig. 23

14. Apply a coat of petrol-gel to the auger shaft.
15. Install gearmotor, making sure that insulation is

properly seated between gearmotor and main
housing as shown.

16. Firmly tighten four gearmotor bolts in place.

removed for clarity

Note: Shuttle housing

Fig. 21

6. Orient auger shaft with keyway in the

upward position.

7. Force main housing into position against evaporator

and place 1/4" (7mm) diameter Phillips screwdriver
into hole in the auger shaft.

8. Replace V-band clamp as shown.
9. Replace nut on V-band clamp and tighten.
10. Remove screwdriver.

Advertising