Genie Model 2022 User Manual

Page 13

Advertising
background image

MOUNTING THE OPENER:

1. Getting started.

• Position assembled rail on wall next to header

bracket (Fig. 2-4).
– Place material on floor under power head to

protect from scratching. (A box, stool, or
similar device may be needed to clear a
torsion spring.)

NOTE: For header bracket pins locate Bag 2 from
Box 1.

2. Mounting the assembly.

• Attach rail to header bracket using clevis pin

and cotter pin (Fig. 2-5).

• Support power head on step-ladder to prevent

interference with header mounted (torsion)
spring.

NOTE: Before final attachment to ceiling, insure
that assembly is in proper alignment
(Fig. 2-4).

NOTE: For nuts, bolts, and lag screws locate Bag
3 from Box 1.

• On finished ceilings, locate ceiling joists or

trusses using a stud finder or similar device.
Attach angle iron (not provided) to joists or
trusses through finish material using (provided)
lag screws (Fig. 2-6).

• On unfinished ceilings or open ceilings, straps

may attach directly to joists or trusses.
Depending on the garage construction, extra
framing material (not provided) which may be
required should be installed using appropriate
construction techniques (Fig. 2-6).

NOTE: Refer to your local building codes for
appropriate construction techniques.

• Attach mounting straps (not provided) to ceiling

using lag bolts (Fig. 2-6).

• Set height of power head to following

(Fig. 2-6).
a) Rail must clear door at door’s highest point

of travel.

b) Rail must be level or at power head end

slightly below level.

• Securely tighten power head mounting bolts

and nuts.

• Carefully raise and lower door manually.

Ensure door does not contact any section of
power head or rail.

• Check that rail clamp bolts and nuts are tight.
DO NOT PLUG OPENER IN YET!

YES // OUI

NO

NO

FIG. 2-4

Position assembly and align.

VIEW

FROM ABOVE

(not to scale)

HEADER BRACKET

Mounting Straps

(not provided)

FIG. 2-6

Mounting the power head.

ANGLE IRON ON FINISHED CEILING

Attach angle iron to beams

UNFINISHED OR OPEN BEAM

Extra framing

not needed

Extra framing

NEEDED

DRYWALL

bolts & nuts

bolts & nuts

FIG. 2-5 Rail mounting to header bracket

.

COTTER PIN

CLEVIS PIN

(Chain drive

shown)

PN# 37026500123 02/26/2010 REV. 1

13

Advertising
This manual is related to the following products: