Installation instructions, Replace the base grille, Set the controls – GE 200D8074P050 User Manual

Page 31: Start the icemaker

Advertising
background image

31

Installation Instructions

REPLACE THE BASE GRILLE

Replace the grille by installing the two Phillips

head screws.

7

SET THE CONTROLS

Set the controls to the recommended setting.

8

START THE ICEMAKER

Set the icemaker power switch to the I (on)

position. The icemaker will not begin to operate

until it reaches its operating temperature

of 15°F (–9°C) or below. It will then begin

operation automatically. It will take 2–3

days to fill the ice bin.

NOTE:
In lower water pressure conditions, the water

valve may turn on up to 3 times to deliver

enough water to the icemaker.

9

Power

switch

Advertising