Spindle break-in, Notice – Grizzly Vertical Milling Machines G0728 User Manual

Page 22

Advertising
background image

-20-

Models G0728–31 (Mfg. Since 11/11)

3. let the mill run at this speed for 20 minutes,

then turn the spindle

OFF and wait for it to

stop.

4. turn the spindle direction switch to the rEv

position, and let it run for another 20 minutes.

5. set the spindle speed at 1650 rpM (g0728/

g0729), or 1720 rpM (g0730/g0731), then
repeat

Steps 2–4.

6. turn the mill OFF. the spindle break-in is

now complete and the machine is ready for
operation.

Spindle break-In

it is essential to closely follow the proper break-in
procedures to ensure trouble-free performance of
this mill.

To perform the spindle break-in procedure:

1. adjust the pulleys to set the spindle speed

to 230 rpM (g0728/g0729), or 270 rpM
(g0730/g0731) (see

page 27 for detailed

instruction on

Adjusting Spindle Speed).

2. turn the switch to the FWD position.

do not attempt to perform the spindle break-

in until successful completion of the Test

Run section on page 19. failure to complete

the test run of the machine increases the

chance for serious injury or property dam-

age.

Successfully complete the spindle break-in

procedure to avoid rapid wear of spindle

components when placed into operation.

NOTICE

Complete the Initial lubrication procedures

on page 18 before proceeding. failure to

follow reasonable lubrication practices as

outlined in this manual could lead to pre-

mature failure of your mill and will void the

warranty.

Advertising