22 Generac

®

Power Systems, Inc.

Section 4 — Maintenance

Centurion Liquid-cooled 15 kW and 25 kW Generators

Maintenance

Level 1

Level 2

Level 3

Level 4

Tasks

Recom-

Task

Required

Task

Required

Task

Task

mended

Comp.

to be done

Comp.

to be done

Comp.

Required

Comp.

to be done

(Date-

3 months/

(Date-

Semi-

(Date-

to be done

(Date-

monthly/

Initials)

Break-in

Initials)

annually/

Initials)

Annually/

Initials)

10 hrs.

30 hrs.

50 hrs.

100 hrs.

13. Initiate an automatic start

and transfer of the unit to
site load and exercise it for
at least one hour looking
for leaks, loose
connections or
components, and abnormal
operating conditions.
Correct as necessary.

14. Start and exercise the unit

at full rated load (use a
load bank if the site load is
not enough) for at least
two hours looking for
leaks, loose connections
components, and abnormal
operating conditions.
Correct as necessary.

15. Change the engine oil.
16. Replace the engine oil

filter(s).

17. Replace the engine air

filter(s).

18. Check the engine spark

plugs on gas engine driven
units. Clean and re-gap or
replace as necessary.

19. Perform a five minute

no-load operational run of
the unit looking for any
post service problems.

20. Return the unit to standby

setup for operation when
required.