4 how to secure the drain pipe – Goldstar LWJ0611PCG User Manual

Page 15

Advertising
background image

3. INSTALL THE AIR CONDITIONER IN THE WINDOW

a. Carefully lift the air conditioner and slide it into the

open window. Make sure the bottom guide of the air
conditioner drops into the notches of the
L bracket. See Figure. 27.

IMPORTANT :
When the air conditioner drops into the L bracket, the air
conditioner will be centered in window opening as shown in
Figure. 28.

b. While steadying the air conditioner, carefully bring the

window sash down behind the upper guide of the air
conditioner, as shown in Figure. 29.

4. SECURE THE GUIDE PANELS

Extend the guide panels (TYPE F) to fill the window
opening using 4 screws (TYPE B) to secure them, as
shown in Figure. 30.

5. INSTALL THE SASH SEAL AND SASH LOCK

a. Cut the sash seal (TYPE E) to the window width. Stuff

the sash seal between the glass and the window to
prevent air and insects from getting into the room, as
shown in Figure. 30.

b. Fasten the L bracket using a (TYPE A) screw, as

shown in Figure. 30.

6. Window installation of room air conditioner is now

completed. See ELECTRICAL DATA for attaching
power cord to electrical outlet.

3.2.4 How to Secure the Drain pipe

In humid weather, excess water may cause the BASE
PAN to overflow. To drain the water, remove the DRAIN
CAP and secure the DRAIN PIPE to the rear hole of the
BASE PAN. (Figure. 31)

—15—

OUTSIDE

INSIDE

L BRACKET

OUTER SILL

SHORT SIDE

INNER SILL

TYPE A

8"

8"

CENTER LINE

CENTER LINE

SEAL

WINDOW FRAME

BOTTOM
GUIDE

ABOUT 1/4"

L BRACKET

UPPER GUIDE

DRAIN PIPE

DRAIN CAP

hang

push

TYPE B

SASH SEAL

(TYPE E)

L BRACKET

TYPE A

Figure 27

Figure 28

Figure 29

Figure 30

Figure 31

Advertising
This manual is related to the following products: