PRE-OPERATION INSPECTION

Pre-operation Inspection

R

Be sure that the operator’s manual is complete,

legible and in the storage container located on
the machine.

R

Be sure that all decals are legible and in place.

See Decals section.

Check the following components or areas for
damage, improperly installed or missing parts and
unauthorized modifications:

R

Winch and related components

R

Base components

R

Legs

R

Stabilizers and latch plates (if equipped)

R

Mast columns

R

Carriage hold-down bar

R

Cable anchor

R

Cable and pulleys

R

Wheels and casters

R

Load handling attachments

R

Nuts, bolts and other fasteners

R

Cable (kinks, frays, abrasions)

Check the entire machine for:

R

Dents or damage

R

Corrosion or oxidation

R

Cracks in welds or structural components

R

Be sure that all structural and other critical

components are present and all associated
fasteners and pins are in place and properly
tightened.

R

Be sure there is a minimum of 4 wraps of cable

around the winch drum when the carriage is fully
lowered.