Step 2, install mounting bracket, Step 3, install duct bracket, Install duct bracket – GE MONOGRAM ZV900 User Manual

Page 17: 3install mounting bracket

Advertising
background image

Installation Instructions

INSTALLATION—RECIRCULATING

16

INSTALL DUCT BRACKET

The duct bracket should be installed against the
back wall and flush with the ceiling. This bracket will
hold the duct cover in place at the top.
Secure the bracket to the wall:

Align the marked centerline on the bracket with

the centerline on the wall.

Mark 2 screw hole locations in the wall.
Drill 3/16

pilot holes in the marked locations.

If pilot holes do not enter studs, enlarge the holes

to 3/8

and install wall fastener anchors.

Drive screws, by hand, into the fasteners to allow

anchors to expand. Remove the screws.

Secure the bracket to the wall with wood screws

and/or fasteners.

3

INSTALL MOUNTING BRACKET

This vent hood must be secured to the horizontal
support or wall studs.
• With the template taped in place, use a punch to

mark mounting bracket screw locations.

Drill 3/16

pilot holes in 2 of the punched locations

in the lower bracket.

Remove the template.

Use wood screws to secure the mounting bracket

to the wall. The screws must engage wall studs or
the installed horizontal mounting support.

Check to be sure that the bracket is level.

2

14-5/8

to top of

bracket

C

L

ALIGN BOTTOM EDGE

WITH PENCIL LINE,

INDICATING BOTTOM

OF THE HOOD

Drill 2 (two) 3/16

pilot holes through studs or rear wall support

REAR WALL

MOUNTING TEMPLATE

49-80405 04-06 JR

Advertising