Step 5, install duct transition and damper, Step 6, install hood to support, Step 7, connect duct – GE ZV541 User Manual

Page 15: Installation instructions, Step 5 install duct transition with damper, Step 6 install hood, Step 7 connect duct

Advertising
background image

15

Installation Instructions

STEP 5 INSTALL DUCT TRANSITION

WITH DAMPER

IMPORTANT: Remove shipping tape from damper and
check that damper moves freely.
• Place the transition piece over the hood exhaust and

secure with 4 Screws C provided.

• Use duct tape to seal the connection. Check to be

sure the damper moves freely.

STEP 6 INSTALL HOOD

Note: THREE PEOPLE ARE REQUIRED TO
COMPLETE THIS INSTALLATION!

• Back out the hanging screws on the bottom of the

support frame to a 1/4" gap.

• Lift the hood up to the support frame. Carefully align

the hood keyhole to the screws on the support frame.
Slide the hood to engage the keyhole slots.

• Tighten the screws.

Slide Duct

Collar Down

to Cover Gap

Duct

Transition

Bumper Pads

Attachment

Screws

Attachment

Keyholes

1/4" Gap

Install

2 Safety

Screws

Screws C

STEP 7 CONNECT DUCT

• Loosen duct collar and slide

down to cover gap between
transition and house duct.
Tighten collar
screws and tape all joints.

• Seal all connections with duct

tape.

Note: Do not drive screws through this duct
connection. Doing so will prevent proper damper
operation.

Screws C

• Install safety screws into the top of the hood as

shown.

• Check hood level in both directions.

Slide Duct

Collar Down

to Cover Gap

Advertising