Tools and materials required, Remove the packaging, Tools and materials required remove the packaging – GE ZV541 User Manual

Page 8: Installation preparation, Important

Advertising
background image

8

Installation Preparation

TOOLS AND MATERIALS REQUIRED

(NOT SUPPLIED)

Pencil and tape measure

Pliers

Electric or battery operated drill
and 3/16", bits, Phillips and Flat
Blade Screwdriver bits.

120V 60Hz. 15 or 20 Amp,
2-wire with ground. Properly
grounded branch circuit.

Key Hole Saw

Hammer

Wire cutter/stripper

Step ladder

Metal Snips

Saber saw
or Sawsall

Wire nuts

Phillips and flat blade
screwdrivers

Strain relief for
junction cover.

Spirit level

Flashlight

Safety glasses

10" round metal
duct, length to
suit installation.

Duct tape

7/16" Pivoting

hex socket with 4"
and 6" extensions

REMOVE THE PACKAGING

• Remove the parts packages and packing materials.
• Lift the hood out of the box.

IMPORTANT:

Lift the hood by grasping

the outside edges of the exhaust opening on the top.

• Carefully, lay the hood on its side. A support frame is

secured to the inside top of the hood. Remove the
attachment screws at the outside top. Discard screws.

• Grasp the support

frame inside the
hood with both
hands and
carefully rotate out
of the opening.

Be careful not to
scratch the hood.

Hood

Parts

Parts

Parts

Motor

Mounted

on Skid

Shipping Carton

• Place the hood on a protective surface to prevent

scratches and damage to the stainless steel finish.

• The hood motor is shipped secured to the skid with 4

screws. Locate and remove 2 screws on each side of
the motor. Discard the shipping skid and screws.

Carpenter’s square

Advertising