Installation instructions, Warning, Gas requirements – GE PTDS650GMWT User Manual

Page 2: Preparing for installation of new dryer

Advertising
background image

Installation Instructions

2

Minimum Clearance Other Than Alcove or Closet Installation

Minimum clearance to combustible surfaces and for air opening are: 0 in. clearance both sides and 1 in. rear.

Consideration must be given to provide adequate clearance for installation and service.

2

GAS REQUIREMENTS

WARNING

• Installation must conform to local codes and

ordinances, or in their absence, the NATIONAL FUEL

GAS CODE, ANSI Z223.

• This gas dryer is equipped with a Valve & Burner

Assembly for use only with natural gas. Using

conversion kit WE25X0217, your local service

organization can convert this dryer for use with

propane (LP) gas. ALL CONVERSIONS MUST BE MADE BY

PROPERLY TRAINED AND QUALIFIED PERSONNEL AND

IN ACCORDANCE WITH LOCAL CODES AND ORDINANCE

REQUIREMENTS.

• The dryer must be disconnected from the gas supply

piping system during any pressure testing of that

system at a test pressure in excess of 0.5 PSI (3.4 KPa).

• The dryer must be isolated from the gas supply piping

system by closing the equipment shut-off valve during

any pressure testing of the gas supply piping of test

pressure equal to or less than 0.5 PSI (3.4 KPa).

GAS SUPPLY

• A 1/8-in.National Pipe Taper thread plugged tapping,

accessible for test gauge connection, must be installed

immediately upstream of the gas supply connection to

the dryer. Contact your local gas utility should you have

questions on the installation of the plugged tapping.

• Supply line is to be 1/2-in. rigid pipe and equipped with an

accessible shut-off within 6 ft. of, and in the same room

with the dryer.

•Use pipe thread sealer compound or Teflon tape appropri-

ate for natural or LP gas.

• You must use with this dryer a flexible metal connector

listed connector ANSI Z21.24 / CSA 6.10. The length of the

connect shall not exceed 3 ft.

• Connect flexible metal connector to dryer and gas supply.

• Open shut-off valve.

INTERNAL DUCT

OPENING

CHECK THAT EXHAUST

HOOD DAMPER OPENS

AND CLOSES FREELY.

WALL

TILT THE DRYER SIDEWAYS

AND REMOVE THE FOAM

SHIPPING PADS BY

PULLING AT THE SIDES

AND BREAKING THEM

AWAY FROM THE DRYER

LEGS. BE SURE TO

REMOVE ALL OF THE

FOAM PIECES AROUND

THE LEGS.

1

PREPARING FOR INSTALLATION

OF NEW DRYER

TIP: Install your dryer before installing your washer.

This will allow better access when installing dryer

exhaust.

DISCONNECTING GAS

REMOVING LINT FROM WALL

EXHAUST OPENING

• Remove and discard existing plastic or metal foil

transition duct and replace with UL listed transition

duct.

DISCONNECT AND DISCARD OLD

FLEXIBLE GAS CONNECTOR AND

OLD TRANSITION DUCTING

MATERIAL. REPLACE WITH NEW

CSA(AGA) APPROVED FLEXIBLE

GAS LINE CONNECTOR AND UL

APPROVED TRANSITION DUCT.

TURN GAS

SHUT-OFF VALVE

TO THE OFF

POSITION.

WARNING -

NEVER REUSE OLD

FLEXIBLE CONNECTORS.

The use of old flexible connectors can cause leaks and

personal injury. Always use new flexible connectors

when installing gas appliances.

DRYER GAS SUPPLY CONNECTION

2"

2-5/8"

3/8" NPT MALE THREAD GAS SUPPLY

NOTE: Add to vertical dimension

the distance between cabinet

bottom to floor.

Advertising