GE DS-242-POE User Manual

Page 3

Advertising
background image

P/N 1069668 • REV 1.0 • ISS 22FEB10

3 of 10

Figure 1: Terminal setup diagram

A terminal program is required to make the software connection to the GE-DS-
242-PoE Managed Switch. Windows' Hyper Terminal program is a good choice.
The Hyper Terminal program can be accessed from the Start menu.

1. Click

START, then Programs/Accessories and then Hyper Terminal.

2. When the following screen appears, make sure that the COM port is

configured as:

• Baud :

57600

• Parity

: None

• Data bits

: 8

• Stop

bits :

1

• Flow Control : None

Figure 2: COM1 properties window

Advertising