Installation preparation, Materials you will need, Tools you will need – GE ZBD6905 User Manual

Page 4

Advertising
background image

Installation Preparation

MATERIALS YOU WILL NEED:

Materials Required for All Installations

90

°

Elbow (3/8”NPT external thread on one end, opposite

end sized to fit water supply)

Note: Use new ferrule. Do not use old parts.

Strain relief for electrical connection

Thread seal tape

UL Listed wire connectors (3)

Screw type hose clamps

Materials For New Installations Only:

Air gap for drain hose, if required

Waste tee for house plumbing, if applicable

Electrical cable or power cord, if applicable

Hand shut-off valve (recommended)

Water line 3/8” min. copper or 1/2” min. plastic (plastic

must be tested for temperature and pressure)

Coupler for extending drain line, if applicable

4

90

°

Elbow

Thread Seal

Tape

Wire Nuts

Screw Type Clamps

Waste Tee

Shut-Off

Valve

Electrical Cable
or Power Cord

Air
Gap

Coupler

Hot Water Line

TOOLS YOU WILL NEED:

Tools Required for All Installations

Phillips head and flat blade screwdrivers

3/8”, 5/16” and 1/4” nutdrivers

Level

Carpenters square

Measuring tape

Safety glasses

Flashlight

Bucket to catch water when flushing the line

Tubing cutter

Gloves to protect against sharp edges

Wire strippers

For New Installations Only:

Drill and appropriate bits

Hole saw set

Flat Blade Screwdriver

Flashlight

Bucket

Level

Phillips Head
Screwdriver

Safety Glasses

Hole

Saw Set

Square

Tubing
Cutter

Adjustable

Wrench

Measuring Tape

Gloves

Nut Driver

Drill
and Bits

Strain Relief

Wire Strippers

Advertising
This manual is related to the following products: