Gas-Fired Products 602-30 User Manual

Page 9

Advertising
background image

Page 9

anchor or drilled hole.

8. Tighten both screws until heater is firmly secured to wall. Do not over tighten.

1. Clearance requirements from surface of carpeting, tile or other combustible

material (See Figure 1.).

Wall Mounted & Floor Mounted With Base Provided

Rear

0 Inches

Sides

13 Inches

Top

36 Inches

Floor

7 Inches

NOTICE:
Maintain the minimum clearances shown in Figure 1, but you can provide greater
clearances from floor, ceiling and adjoining wall.

2. After mounting brackets are installed, hang heater on mounting brackets in holes

provided at the rear of heater (See Figure 7.).

Figure 5

Figure 6

24"
Min.

16"

1.18"

18"
Min.

Adjoining Wall

30,000 BTU/Hr Model

Floor

Advertising
This manual is related to the following products: