Exhausting the dryer (cont.), Installation instructions, Ducting component equivalency chart – GE UPVH880 User Manual

Page 26

Advertising
background image

EXHAUSTING THE DRYER (cont.)

EQUIVALENT

RIGID

NUMBER

EQUIVALENT

DUCT PIECES

LENGTH

X

USED

=

LENGTH

Rigid Metal

1 Ft.

X

( )

=

Ft.

Ducting
(Preferred)

Semi-Rigid

25 Ft.

X

( )

=

Ft.

Metal Ducting
(inside diameter
does not change)

Flexible Metal

50 Ft.

X

( )

=

Ft.

Ducting (inside
diameter changes)

Elbows (90°/45°)

10 Ft.

X

( )

=

Ft.

Turns less

2 Ft.

X

( )

=

Ft.

Than 4 Ft.

Rigid Metal

1 Ft.

X

( )

=

Ft.

Ducting

Semi-Rigid

2 Ft.

X

( )

=

Ft.

Metal Ducting

Flexible Metal

Ft.

Ducting Not
Recommended

4

Wall Cap

5 Ft.

X

( )

=

Ft.

Louvered Wall

10 Ft.

X

( )

=

Ft.

Cap

2.5

Wall Cap

23 Ft.

X

( )

=

Ft.

Total Ductwork Length

=

Ft.

TOTAL MUST BE LESS THAN OR EQUAL TO 150 FT.

Installation Instructions

26

DUCTING COMPONENT EQUIVALENCY CHART

2.5

(6.35

cm)

4

(10.2 cm)

TRANSITION

DUCTING

(DR

YER

TO

W

ALL)

INSIDE

W

ALLS/CEILING

(W

ALL

TO

W

ALL

CAP)

W

ALL

CAPS

Less Than 4 Ft.

Advertising