Rack-mount installation – GE DS-82 User Manual

Page 21

Advertising
background image

Chapter 2: Installation

GE-DS-82 and 82-PoE Ethernet Managed Switch User Manual

17

NOTE:

Connection to the Managed Switch requires UTP Category 5 network cabling

with RJ-45 tips. Refer to the Cabling Specification in Appendix A for further
information.

Step 4: Connect the Managed Switch to network devices.

A. Connect one end of a standard network cable to the 10/100/1000 RJ-45 ports
on the front of the Managed Switch.
B. Connect the other end of the cable to the network devices (printer servers,
workstations, routers etc).

Step 5:

Supply power to the Managed Switch

.

A. Connect socket end of the power cable to the socket on the Managed Switch
rear panel.
B. Connect the power cable plug to a standard wall outlet.
C. Switch the power switch on the rear panel to ON. When the Managed Switch
receives power, the Power LED should light and remain solid Green.

Rack-mount Installation

Use the following instructions to install the Managed Switch in a 19-inch standard
rack.
Step 1: Place the Managed Switch on a hard flat surface, with the front panel
positioned towards the front.

CAUTION:

Use only the screws supplied with the mounting brackets. Damage caused

by using incorrect screws will invalidate the warranty.

Step 2: Attach the rack-mount bracket to each side of the Managed Switch. Use the
supplied screws attached to the package. Figure 6 shows how to attach brackets to
one side of the Managed Switch.

Figure 6: Attaching rack-mount brackets to the GE-DS-82

Step 3: Secure the brackets tightly, but do not over tighten screws.

Advertising
This manual is related to the following products: