Without, Installation preparation, Preparation – GE Advantium ZSC1202SS User Manual

Page 6: An accessory storage drawer, Caution

Advertising
background image

Installation Preparation

6

Preparation

WITHOUT

an Accessory Storage Drawer

PREPARE THE OPENING (cont.)

Installation over a GE/Monogram Oven and
Warming Drawer:

NOTE: Additional clearances between the cutouts
may be required. Check to be sure the oven
supports above the Warming Drawer location
do not obstruct the required interior depth
and height. See Warming Drawer installation
instructions for details.

CAUTION:

For personal safety, the

mounting surface must be capable of supporting
the cabinet load, in addition to the added weight
of this approximate 80-pound oven, plus
additional oven loads of up to 50 pounds
or a total weight of 130 pounds.

Construct Solid
Bottom Min.
3/8

″ Plywood

Supported by
2 x 4 or 2 x 2
Runners all
Four Sides

30

23-1/2

25-1/4

17-1/2

2

Min.

(3

Recommended)

Per Oven

Requirement

2

Min.

(3

Recommended)

PREPARE THE OPENING (cont.)

Installation over a GE/Monogram oven:

• If you are replacing a GE/Monogram electric

double oven with the combined installation
of an Advantium 120V and a single oven, use
the dimensions shown. The middle rail separating
the two openings may need to be larger than
the 2

″ minimum shown.

30

23-1/2

25-1/4

17-1/2

2

Min.

(3

Recommended)

Construct Solid
Bottom Min.
3/8

″ Plywood

Supported by
2 x 4 or 2 x 2
Runners all
Four Sides

Per Oven
Requirement

Per Warming
Drawer Requirement

Advertising
This manual is related to the following products: