5) hang the opener, Warning, Installation step 5 – Master Lock ATS 211 User Manual

Page 12: Hang the opener, Figure 1 figure 2

Advertising
background image

Installation Step 5

Hang the Opener

Two representative installations are shown.
Yours may be different.
Hanging brackets should
be angled, Figure 1, to provide rigid support. On
finished ceilings, Figure 2, attach a sturdy metal
bracket to structural supports in ceiling before
installing the opener. The bracket and fastening
hardware are not supplied.

Measure the distance from

each side of the opener

to the structural support.

• Cut both pieces of the hanging bracket to required

lengths.

Drill 3/16" pilot holes in the structural supports.

• Attach one end of each bracket to a support with

5/16"x1-7/8" lag screws.

• Fasten the opener to the hanging brackets with

5/16"-18x7/8" hex screws, lock washers and nuts.

• Check to make sure the rail is centered over the

door (or in line with the header bracket if the
bracket is not centered above the door).

• Remove the 2x4. Operate the door manually. If the

door hits the rail, raise the header bracket.

Grease the top and underside of the rail
surface where the trolley slides. A tube of
grease is supplied.

5/16"-18x7/8" Screw

5/16" Lock Washer

5/16"-18 Nut

Measure
Distance

Lag Screws

5/16"x1-7/8"

Structural

Supports

12

The opener could fall and injure someone if it
is not properly secured. Fasten the opener
securely to structural supports of the garage.

Lag Screw

5/16"-18x1-7/8"

Hex Screw

5/16"-18x7/8"

Nut 5/16"-18

Lock Washer 5/16"

Hardware Shown Actual Size

WARNING

Figure 1

Figure 2

RAIL GREASE

NO. 83A4

Lag Screws

5/16"x1-7/8"

Bracket

(Not Supplied)

FINISHED CEILING

Hidden
Support

(Not Supplied)
5/16"-18x7/8" Screw
5/16" Lock Washer
5/16"-18 Nut

5/16"-18x7/8" Screw
5/16" Lock Washer
5/16"-18 Nut

la

Advertising