MITSUBISHI ELECTRIC MC300 Workstation Computer User Manual

Page 13

Advertising
background image

9

MAN-WKSTN-001

MC Series Computers

Installing the WORKSTATION requires the following three major steps:

The Workstation is a front-panel stud mount unit. Mounting of the unit requires
a panel cutout, and drilling fourteen (14) holes in the mounting surface for the
mounting studs. Please see the Mounting section beginning on page 14 for
mounting diagrams and instructions.

Now that your Workstation is mounted, you are ready to connect your unit to
the power source and peripheral devices. The Workstation has 2 Serial Ports.
COM 1 is a dedicated RS-232 port and COM2 is a selectable RS-232/RS-422/
RS-485 port. (Default is RS-232, if RS-422 or RS-485 is required, refer to the
PCA1623 Embedded Processor Board Manual, MAN-P1623-001.) The Paral-
lel Port supports SPP/EPP/ECP. The Workstation also has one USB (1.1)
port (a second USB port is used internally for the touch panel interface). Note
that the Workstation is a 115/230 VAC powered unit. See the section on Exter-
nal Components
, beginning on page 16 for further information.

The Workstation has some adjustable features and selectable options. To
make adjustments or select from available options, enter the SETUP MODE
on powerup and follow the procedures provided in the Communications Setup
section beginning on page 20.

Mount the

Workstation

Make

Connections

Setup

INSTALLING THE WORKSTATION COMPUTER— OVERVIEW

4 INSTALLATION

Advertising