Miller Electric Welding User Manual

Page 29

Advertising
background image

OM-169 510 Page 25

1

Plasma Arc Welding Power Source

Ground metal machine case, line discon-
nect device, input supply, and workpiece (if
required).

2

Center Point Of Welding Zone

Midpoint between high-frequency source
and welding torch.

3

Welding Zone

A circle 50 ft (15 m) from center point in all
directions.

4

Torch And Work Cables

Keep cables close together.

5

Conduit Joint Bonding And Grounding

Electrically join (bond) all conduit sections
using copper straps or braided wire. Ground
conduit every 50 ft (15 m).

6

Water Pipe And Fixtures

Ground water pipe every 50 ft (15 m).

7

External Power Or Telephone Lines

Locate high-frequency source at least 50 ft
(15 m) away from power and phone lines.

8

Metal Building Panel Bonding
Methods

Bolt or weld building panels together, install
copper straps or braided wire across
seams, and ground frame.

9

Grounding Rod

Consult the National Electrical Code for
specifications.

10 Windows And Doorways

Cover all windows and doorways with
grounded copper screen of not more than
1/4 in (6.4 mm) mesh.

11 Overhead Door Track

Ground the track.

8

9

11

10

S-0755

1

2

3

50 ft

(15 m)

Welding Zone

4

7

50 ft

(15 m)

Metal Building

Nonmetal Building

9

9

5

9

6

Ground All

Metal Objects

And All Wiring

In Welding Zone

Using #12 AWG Wire

Ground

Workpiece

If Required

By Codes

Figure 6-3. Correct Installation

Advertising