Milan Technology MIL-S1000 User Manual

Page 38

Advertising
background image

Installing 1000Base-SX/LX Modules

a. Remove the protective plastic covers from the fiber

connectors on the Module.

b. Ensure that the Switch is powered up.

c. Plug the SC connector on the fiber cable into the fiber

socket on the Module.

d. Connect the other end of the fiber optic segment to an

appropriate device fitted with a 1000Mbps adapter.

Check the LED indicators on the front of the Switch to
ensure that the Module is operating correctly.

Removing the Modules

a. Ensure that the power supply and the backbone

connection cables are disconnected from the Switch.

b. Place the Switch on a flat surface. Undo the two captive

thumbscrews securing the Module into the Switch. Do
not remove any other screws from the rear of the
Switch.

c. If you are not installing another Module immediately, you

must replace the blanking plate to ensure that dust and
debris do not enter the Switch, as well as to aid
circulation of cooling air.

Advertising