14

STARLINE

9

Route and connect the fiber service cable.

10

Apply power to the node. Allow five to ten seconds for the system self-diagnosis to complete.

11

Verify that the green LED (

ENABLE

), located on the top panel of each SG4-DRT-2X, is

illuminated to confirm enable status.

12

Measure the RF power at each channels test point on the top of each SG4-DRT-2X.

The test point is a

−20 dB test point located after the JXP pad location and indicates the

level into the SG4-DRT-2X.

13

Place the proper JXP pad into each channels pad facility to achieve the nominal total power
level at the test point of

−5 dBmV.

14

Review return-path system levels.

The SG4-DRT-2X is configured to drive the laser to the recommended level (

+15 dBmV)

when the total combined power at the housing ports connected to each leg of the segmented
return board is approximately

+28 dBmV.

15

Measure the optical power level at the dc test point using a multimeter. The scaled voltage
at this test point is 0.5 V/mW.

16

Secure all cables and fibers.

17

Close the housing and use a torque wrench to progressively tighten the housing bolts to a
final torque of 12 ft-lbs. in the sequence stamped on the housing lid.

For more specific information regarding return path setup procedures, refer to the supplemental
document Return Path Level Selection, Setup, and Alignment Procedure.