System should be up and running, Finishing touches – Magma PCIe Expansion System EB2R User Manual

Page 38

Advertising
background image

M A G M A

30

System Should Be Up and Running

As noted previously, apply power to the Magma expansion chassis first,
then power up the computer.

Use the procedures detailed in

Chapter 3

to confirm proper card

installation(s). When everything is functioning correctly, your Windows
Device Manager should look something like this for any given slot:

If you discover that any of your 3

rd

Party PCIe cards contains a

(exclamation mark) you have a problem with that card.

Refer to

Chapter 5 Troubleshooting

for further guidance.

Finishing Touches

Once your system is working properly, replace the host computer and
the expansion chassis covers.

Last, if you previously installed the rack-mounting brackets, simply slide
and secure the chassis in its place within the rack cabinet.

It is advisable for the chassis to be turned off while docking it into the
rack cabinet. If it cannot be turned off, pay special attention to the iPass
and power cable management prior to plugging them into the chassis.

Advertising
This manual is related to the following products: