Makita 3612 series, Preparing motor housing, Preparing the base – Makita RZ 100 User Manual

Page 9: Fig 4, Fig 6, Fig 5, Fig 1, Fig 2, Fig 3

Advertising
background image

Page 26

Makita 3612 Series

Router Raizer Parts Required:

( see page 1) #1, #2, #4, #7, #11, #12, #13, #14, ( three #15 ) #16, #18, #19, #21, #22, #23, #24, #25, #26,

#27, #28, #29, ( #30, #31, #46 for router table installation ).

Preparing Motor Housing

1.

Using ( fig 1 ) plunge router down and engage plunge lock.

Remove height knob from height rod.

4.

Select #1 mainshaft, #16 housing bushing, #18 drive nut

washer, #19 short drive nut. Using ( fig 3 ), drop #16 housing

bushing threads up onto #1 mainshaft. Start #1 mainshaft into

bottom of housing and push up through drille hole. Grasp top

of #1 mainshaft and pull #16 bushing into final position. Drop

#18 washer then #19 nut onto #1 mainshaft, and tighten #19

nut onto #16 bushing using 11/16" wrench. Remove #1 main-

shaft

NOTE:

#18 washer must fit on small shoulder #19 nut compare

to inset A ( fig 3 )

Tip:

If #19 nut will not tighten insert long flat blade screwdriver

from bottom into post bore to wedge #16 housing bushing

while tightening #19 short nut

Fig 4

Turret

Stop

Plunge

Post

Fig 6

Turret

Stop

Plunge

Post

Fig 5

2.

Stand router upright, grasp both handles, release plunge lock

and lift motor to clear plunge springs. Remove and set aside

plunge springs with the Original steel spring guide in top of non
turret side post.

1.

Select: hammer, #2 green drive pin. Using ( fig 4 ) remove round subbase.

Line #2 green drive pin up with the height rod roll pin and drive roll pin from base.

Note: this roll pin can drive out hard, and may require re-straightening of #2 drive pin.

Original Steel

Bushing

#4 Rollpin’s

fig 1

Height Rod

Hole Drill to 1/2"

Height Rod

Height Knob

Motor Housing

5.

Using ( fig 3 ) clean inside all post bushings. Apply a light film

of STP ® motor oil treatment. This lubricants anti-friction properties provides the

smoothest possible plunge action, and helps prevent binding and chattering during use.

fig 2

OriginalSteel

Spring Guide

Hammer

Turret

5/8" Hole

Wood Block

Wood Block

Height Rod

Steel Bushing

3.

Select a 1/2" drill bit and drill. Using (fig’s 1 & 3 ) drill the motor

housing height rod hole to 1/2".

Preparing the Base

2.

Prepair a wood block approx. 3/4" X 8" X 4" with a 5/8" hole drilled 1" from one end.

Using ( fig’s 2 & 4 ) stand base upright with height rod bushing centered over 5/8" hole.

Place scrapwood block on top of height rod, drive height rod and bushing down out of

the post. Store height rod pin, height rod and bushing, and height knob.

Note:

the following step secures the post and #12 green bushing to the base using two

roll pins. Both roll pins are installed from the outside of the base, and cannot extend into

the green bushing bore shown dotted lines ( fig 6 ) If #4 green roll pins extend into bore,

insert a screwdriver into bottom of bushing bore and push pins flush.

#12 Green

Bushing

# 2 Green

Drive Pin

Subbase

Height rod

roll pin

Height rod

# 2 Green

Drive Pin

TOP

TOP

3.

Select #12 green nylon bushing. Using ( fig 5 ) turn base upside down with posts on scrap

peice of wood. Drive #12 green bushing into bottom of turret side post until flush with

bottom edge of post. Note: this bushing drives in hard, sanding a slight chamfer on

one end of the bushing aids in installation. The post can be removed from the base

to install this bushing. Once installed drill hole through # 12 green bushing to 21/64"

or ream with 5/16" bit until #1 mainshaft head spins free when placed into bushing.

©

2000-2005 Router Technologies

All Rights Reserved

NOTE: Check Off Each Step When Done

1. Cut #1 mainshaft to 10, 1/8" overall length and debur cut end. Set aside to install later.

4.

If post was removed for step 3. Replace post, Using ( fig 5 ) line up the post rollpin hole

with the rollpin hole through the base. If post was not removed make sure the rollpin

holes are lined up. The green bushing driven in must be drilled for the roll pins,Using a 13/64"

twist drill, drill straight through original rollpin hole and bushing.

Note: this is easily done with a hand drill, when drilling the bit will center itself on the

inside rollpin hole,

5.

Select two #4 green roll pins and #2 green drive pin.

Using ( fig 6 ) place one green roll pin into hole, drive

in until flush with outside of base. Align #2 green

drive pin with roll pin, and drive through original

steel bushing to opposite side. Check and adjust

this roll pin to be flush inside bushing bore. Start

second green roll pin into base, drive in leaving

1/8" exposed. Check bore and adjust if necessary.

Align post and base rollpin holes

Drill completely through using 13/64" bit

#12 Green

Bushing

Plunge Post

Place #16 threads up on

#1 mainshaft then pull #16

into final position

fig 3

#1 mainshaft

#18 Drive Nut

Washer

Small Shoulder

#19 Short Drive Nut

A

Motor Housing

#16 Housing Bushing

Final Position

#18 Drive Nut Washer

#19 Short Drive

Nut

Height Rod Hole Drill to 1/2"

Post

Bushing

Apply Light

Film Of STP®

See other side to finish installation

Advertising