MartinLogan PASSAGE TM User Manual

Page 4

Advertising
background image

Required tools (included):

4mm Allen bit
(2) Push pins

Required tools (not included):

Stud finder
Sharp pencil or pen
Level
Dry wall knife/saw
Wire strippers
Electric drill (with clutch)
Tape measure

Depth required behind wall surface:

3

3

/

16

" (8.1cm)

Required wall opening (includes tolerance):

7

1

/

2

" x 22

15

/

16

" (19.1cm x 58.3cm)

4 Installation

Figure 4. Top view.

Figure 3. Side view.

Figure 2. The Passage is designed to mount anywhere between studs.

Advertising