Installation – Monte Carlo Fan Company 5MYR56 User Manual

Page 2

Advertising
background image

Installation work and electrical wiring must be done by qualified person(s) in accordance with applicable codes and standards (ANSI/NFPA 70-

1999), including fire-rated construction.

Use this unit only in the manner intended by the manufacturer. If you have any questions contact the manufacturer.

After making the wire connections, the wires should be spread apart with the grounded conductor and the equipment-grounding conductor on

one side of the outlet box and ungrounded conductor on the other side of the outlet box.

Before you begin installing the fan, Switch power off at Service panel and lock service disconnecting means to prevent power from being

switched on accidentally. When the service disconnecting means cannot be locked, securely fasten a prominent warning device, such as a tag,

to the service panel.

Be cautious! read all instructions and safety information before installing your new fan. Review the accompanying assembly diagrams.

When cutting or drilling into wall or ceiling, do not damage electrical wiring and other hidden utilities.

Make sure the installation site you choose allows the fan blades to rotate without any obstructions. Allow a minimum clearance of 7 feet from

the floor to the trailing edge of the blade.

To reduce the risk of fire, electric shock, or personal injury, mount to outlet box or supporting system acceptable for fan support.

(Mounting must support at least 35 lbs. (16kg.)).

Do not bend blade holders during installation to motor, balancing or during cleaning. Do not insert foreign object between rotating blades.

Attach the mounting bracket using only the hardware supplied with the outlet box.

To reduce the risk of fire or electric shock, do not use this fan with any solid state fan speed control device, or variable speed control.

If this unit is to be installed over a tub or shower, it must be marked as appropriate for the application.

NEVER place a switch where it can be reached from a tub or shower.

The combustion airflow needed for safe operation of fuel-burning equipment may be affected by this unit’s operation. Follow the heating equip-

ment manufacturer’s guideline safety standards such as those published by the National Fire Protection Association (NFPA), and the American

Society for Heating, Refrigeration and Air Conditioning Engineers (ASHRAE) and the local code authorities.

Warning: Before attempting to replace the fuse make sure that the power is turned off to the fan. Replace only with 3 amp fuse.

Before servicing or cleaning unit, Switch power off at Service panel and lock service disconnecting means to prevent power from being switched

on accidentally. When the service disconnecting means cannot be locked, securely fasten a prominent warning device, such as a tag, to the

service panel.

1.

2.

3.

4.

5.

6.

7.

8.

9.

10

11.

12.

13.

14.

15.

16.

Installation

WARNING: TO REDUCE THE RISK OF FIRE, ELECTRIC SHOCK, OR INJURY TO PERSONS,

OBSERVE THE FOLLOWING: READ AND SAVE THESE INSTRUCTIONS

S

AFETY

T

IPS

TOOLS REQUIRED

Phillips Screwdriver Wire Cutters Pliers Step Ladder

Before you begin installing the fan, Switch power off

at Service panel and lock service disconnecting means

to prevent power from being switched on accidentally.

When the service disconnecting means cannot be

locked, securely fasten a prominent warning device,

such as a tag, to the service panel.

Before installing this fan make sure the outlet

box is properly installed to the house structure.

To reduce the risk of fire, electric shock, or per-

sonal injury, mount to outlet box or supporting

system acceptable for fan support. (Mounting

must support at least 35 lbs.(16 kg.)).

Install the Mountiing Bracket to the Outlet box.

Use only the screws provided with the out-

let box.

Install 4 x 25 watt candelabra base bulbs

included.

3

2

1

4

Install yoke cover onto downrod as shown.

6

Install canopy onto downrod as shown.

5

Advertising