Installation guide – METRObility Optical Systems R200 User Manual

Page 5

Advertising
background image

Radiance R200 Premise Service Platform 5

2

1

Installation Guide

Follow the simple steps outlined in this section to install and start using the
Radiance R200 Premise Service Platform.

NOTE: Electrostatic discharge precautions should be taken when handling any
line card. Proper grounding is recommended (i.e., wear a wrist strap).

Unpack the Platform and Accessories

Check that the following components are included:

• Radiance R200 Premise Service Platform
• 1 power cord (R200-AC only)
• 4 rubber feet
• DC power plug connector (R200-DC only)

The following items are available separately:

• Radiance interface line cards
• Wall mounting bracket

Your order has been provided with the safest possible packaging, but
shipping damage does occasionally occur. Inspect it carefully. If you
discover any shipping damage, notify the carrier and follow their
instructions for damage and claims. Save the original shipping carton if
return or storage of the unit is necessary.

Choose an Appropriate Location

The Radiance R200 is intended for use in office and industrial environ-
ments. Attach the four rubber feet to the bottom of the unit and place it
on a flat surface. The feet provide a space for air circulation.

The R200 may be oriented in any manner that allows you to make the
physical connection to the power source and leaves a minimum of six
(6) inches of space around it for proper ventilation.

The R200-AC must be located within six (6) feet of the AC power
source being used and placed as far away as possible from electrical
noise generating equipment such as copiers, electrostatic printers and
other motorized equipment. If exposed twisted-pair wiring is used
nearby, the wiring should be routed as far away as possible from power
cords and data cables to minimize interference.

Advertising