Installation and user manual – MGE UPS Systems 40-150kVA User Manual

Page 30

Advertising
background image

Installation and User Manual

2.6.4 AC

Output

The connections to be made are the three phases, and ground cables from the load source to the UPS. The
output cables are terminated at the Output Terminal Block (TB2) for 40-80kVA, and the output busbars for 100-
150kVA.

Load cables must be run separately from all other cables (power supply or computer-system interconnection
cables). They should not pass near interference-emitting equipment or sensitive loads.

2.6.5

Battery

The connections to be made are the positive, negative, and ground cables from the battery cabinet to the UPS.
These are terminated at the appropriate connections in the UPS cabinet (see Figures 2-3 and 2-4). Additionally,
control wires and temperature sensors in the battery cabinet must be terminated. Refer to the battery cabinet
installation drawings for more details.

Figure 2-3: Connections for Comet 40-80kVA UPS.

Figure 2-4: Connections for Comet 100-150kVA UPS.

Installation

2 — 5

86-160310-00 E00

Separate Bypass

Input Terminal

Block TB3

(Optional)

Battery

Connections

Main Input

Terminal Block

TB1

Output

Terminal Block

TB2

Fan Control

Switch

SR2

Fan and

Teleservice Fuses

FU7-FU12

Ground Busbar

Neutral Busbar

OUTPUT

BYPASS

INPUT

A4

B4

OPT

C4

A3

B3

C3

A5

B5

C5

+

-

BATT.

Advertising