ICI - Innovative Creations, Inc. AX User Manual

Page 13

Advertising
background image

MAINTENANCE

11

5 MAINTENANCE

5.1 ORDINARY

• Periodically purge the level gauges, probe holder if fitted and the boiler, to avoid the accumulation of

sludge;

• Check the efficiency of the control and regulation instruments, examining carefully the electrical parts

(connections included) and the mechanical parts (pressure switches); it is advisable to replace every
year the ceramic probe-holders;

Carry out burner maintenance (as to the specific instructions);

Check the tightness of flange bolts and the state of the gaskets;

Check the conditions of the boiler door internal covering;

Clean the flue-gas tube bundle and the turbolators;

Carry out correct maintenance to the pump (bearings, mechanical seal),

• Check for wear to the discharge valves; these tend to wear more quickly, due to the abrasive effect of

the sludge during blow-down.


5.2 PERIODIC

5.2.1 Periodic control (every 6 hours of use)


From time to time (every 6 hours of use) the thermal plant must be inspected by qualified personnel to check
the efficiency of all safety accessories:

Safety pressure switch


Water level limits


The system can be reset if no anomalies have been encountered: power off the panel for approx. 20
seconds, power on the main switch and press the reset buttons.

For further details follow the flow chart below:

Advertising