Jumpking OR1213 User Manual

Page 20

Advertising
background image

Attach the first hanging point at the upper edge of the

Netting (20) with the G3 Pole (18) to the Hemisphere Cap (19)

of Top enclosure pole(17). Attach a second hanging point directly

across the Netting (20) from the first hanging point.

Attach the other two hanging point halfway between the

first two hanging points, so four hanging points are

attached as shown.

See insert drawing for attached of G3 Pole (18):

Hemisphere Cap (19) has been attached to the top of the

Top enclosure pole(17).

13. Note: During steps 14 and 15, you will

“tie” the lower edge of the Netting(20)

to the V-rings on the bed by straps.

Please see insert drawing a, b, c, d on next page.

Advertising