Juniper Networks M5 User Manual

Page 73

Advertising
background image

Site Preparation Checklist

Item or Task

Performed
By

Date

Notes

Select the type of rack.

Plan rack location, including required space
clearances.

Secure rack to floor and building structure.

Acquire cables and connectors.

Locate sites for connection of system
grounding.

Calculate power budget and power margin.

Prepare for Router Installation

53

Advertising
This manual is related to the following products:

M10