Framing and Support

The floor structure beneath the bath must be able to support a total weight of bath, water, and bather.

If the subfloor is level, no other preparation is necessary. You can proceed to install the bath. If the subfloor is
not level, you MUST level the entire surface prior to installing the bath. Use a floor leveling compound. Do not
use mortar, plaster or minimal expansion structural foam to set the bath as this will interfere with bath components
on the bottom of the bath. Both sides of a joint or splice of subfloor should be level to each other.

The rim of the bath is not designed to support weight. If finish material is to overlap or contact the bath, the added
weight must be fully self-supporting.

The protective film liner inside the bath is used to prevent damage to the finish from shoes, tools, etc.
during installation. Before installation, remove liner to inspect for any defects, reapply and do not re-
move until final cleanup.

TYPICAL INSTALLATIONS

FLUSH TO WALL

SEMI-SUNKEN

OPTIONAL TILE FLANGE KIT

TILE

1" X 4" (NOT FOR SUPPORT)

MORTAR OR
ADHESIVE

SUB-FLOOR

FINISHING
MATERIAL

BATH RIM

CEMENT BOARD

STUD
WALL

SILICONE
SEALANT

PLASTER

FILLER

FLANGE

MORTAR

1" X 4"
(NOT FOR SUPPORT)

SEALANT

TILE

MORTAR OR
ADHESIVE

FLASHING

NAIL OR
SCREW

SEALANT

FLASHING

1" X 4" (NOT FOR SUPPORT)

Rough-in Reference

The drain requires a cutout in the floor.

2

36"

(900 mm)

*71-3/4"

(*1822 mm)

457 mm

(18")

9-7/16"

(240 mm)

*

Add1/4” (6 mm) to this dimension when roughing-in for 3 wall niche.

For semi-sunken installations, floor cutout is 69-3/4" x 34" (1772 mm x 864 mm).