Assembly, Unpacking and cleanup, Installing bed to stand – Jet Tools JJ-6CSDX User Manual

Page 9

Advertising
background image

9

Assembly

Unpacking and Cleanup

1. Carefully finish removing all contents from both

shipping cartons. Compare contents of the
shipping cartons with the list of contents above.
Place parts on a protected surface.

2. Report any shipping damage to your local

distributor.

3. Clean all rust protected surfaces (bed, fence,

etc.) with kerosene or diesel oil. Do not use
gasoline, paint thinner, mineral spirits, etc.
These may damage painted surfaces.

Cutterhead knives are

dangerously sharp! Use

extreme caution when cleaning. Failure to
comply may cause serious injury!

4. Apply a thin layer of paste wax to the bright

surfaces of the fence and tables to prevent
rust.

5. Set packing material and shipping cartons to

the side. Do not discard until machine has
been set up and is running properly.

Installing Bed to Stand

Referring to Figure 1:

1. Place bed assembly (A) on top of stand (B). Be

sure the identification label (C) on the bed
faces the same direction as the switch (D) on
the stand.

2. Line up two holes in the stand top (E) with

holes in the bed assembly by viewing through
the access door in rear side of the stand.

3. Attach stand to bed assembly by using two 3/8"

lock bolts and lock washers (Figure 2). Hand
tighten only at this time.

4. Line up the third hole in the stand (F) with the

hole in the bed assembly by viewing through
the dust chute (G).

5. Install the third 3/8" lock bolt and lock washer

through the dust chute (G) to secure the bed to
the stand.

6. Tighten all three lock bolts with a 14mm

wrench.
























Figure 1


Figure 2

Advertising
This manual is related to the following products: