Initialization sequence, Status leds, Powering down – Juniper Networks ERX-1410 User Manual

Page 91: Initialization sequence -3, Status leds -3 powering down -3, Figure 6-1

Advertising
background image

Status LEDs

ERX Edge Routers

6-3

Figure 6-1 ERX-1400 series power switches

Initialization Sequence

Each ERX line module is initialized independently. As a result, the CLI
on the SRP module may become available before the line modules have
completed initialization. Commands relating to a line module may fail if
the module has not completed initialization. The

show version

command can be used to display line module status. Do not enter
commands for a line module until its state is “online.”

Status LEDs

For information on the system’s LEDs, see

Chapter 8, Troubleshooting

.

Powering Down

If you need to power down or remove the SRP module, first enter the
halt command to temporarily suspend the system’s operation. See

ERX

System Basics Configuration Guide, Chapter 4, Managing the System

for

more information.

Caution: If you do not use the halt command before removing or powering down
an SRP, the system’s NVS card may become corrupted.

If you shut down the system improperly, it will run an investigation of the
file allocation table (FAT) next time it reboots.

Power switches

Power input module

Advertising
This manual is related to the following products: