Panel kit installation requirements – Jenn-Air W10379136A User Manual

Page 12

Advertising
background image

12

Standard Integrated Grille Installation

Requirements

IMPORTANT:

A Standard Integrated Grille installation can be achieved with
either a 24" (60.9 cm) or 25" (63.5 cm) deep opening.

Use the standard grille bracket (provided with refrigerator) to
attach the standard grille.

The grille panel height, shown in the “Standard Integrated
Grille Installation—Side View” graphic, allows for an air gap
critical to refrigerator performance.

Standard Grille Bracket

Standard Integrated Grille Installation—Side View

Standard Integrated Grille Installation—Full Product View

Panel Kit Installation Requirements

See the “Models” section to see the panel kit options available
for your model.

IMPORTANT:

A panel kit installation can be achieved with either a 24"
(60.9 cm) or 25" (63.5 cm) deep opening.

A standard grille is used to achieve a panel kit installation.
Use the standard grille bracket (provided with refrigerator) to
attach the standard grille.

The grille panel height, shown in the “Panel Kit Installation—
Side View” graphic, allows for an air gap critical to refrigerator
performance.

Standard Grille Bracket

A. Top grille filler
B. Soffit

C. Airflow

D. Grille panel

E. Door panel

B

C

D

E

A

C. Airflow

C

Advertising