Sharp IQ-8900 User Manual

Page 113

Advertising
background image

If you mistakenly check off an entry as completed, you

can uncheck the entry by touching the check box or

pressing

again. However, if you do this, the entry

will be stored without a due date.

Once a project or task is completed, and you no longer

need the To Do reminder, you can delete the entry, or

groups of entries, which will free up memory in the unit.
See p. 117.

Using
categories

A category is a field that can contain keywords of up to

12 characters that you specify. You can use categories to

facilitate information management, for example, to group
tasks by project, personnel, or other criteria that are

important to you. A total of up to 32 categories can be
used in the

Do application, and up to five categories

can be assigned to each entry.
Once a word is entered in the category field of an entry,
that word is automatically registered and sorted

alphabetically in the category list, in which you can select
a category to assign to an entry. You can also manually
add a word directly to the category list, as well as editing
and deleting words in the list.

Be careful when manually adding categories the unit

upper and lower case letters differently. In

other words “For John” and “for john” are considered 2
different categories by the unit.

Making entries using categories

Enter the following:

Description

Call Frank about Alpha Project

Due Date

Mar 15, 1994

Category 1

Phone Call

Category

Alpha Pro.

1. Press

.

2. Enter the description and due date. Type Call Frank

about

Alpha Project

03 15 1994.

3. Move to the CATEGORY 1 field.

112

Advertising
This manual is related to the following products: